posted in:

LIOS Technology - www.yourcableandwirenews.com

Smart Grid in Russia - Strong Engagement in the “Skolkovo Innovation City” Project

Tuesday, Nov 08, 2011

LIOS Technology has been awarded to supply the online condition monitoring system for one of the largest 500 kV high voltage cable projects – a milestone in modernizing Russian industry and infrastructure.

The Federal Grid Company of Unified Energy System (JSC FGC UES) selected LIOS’  highly reliable distributed temperature sensing system based on OFDR technology for Russia's high-technology hub Skolkovo. Load management, optimization and save grid operation describe the key factors for Russia’s federal grid company to equip the 11,5 km double circuit of 500 kV underground transmission cable with the latest fibre optic real time condition monitoring system.

Source: LIOS Technology

posted in:

Other Cable Equipment News

Amphenol Industrial Introduces Solar Trunk & Drop Cabling Solution 20-02-2012
Legrand Electric Joins SmartPlant® 3D Enthusiastic Followers to Design and Manage More Efficient and Accurate Cable Routing 15-12-2011
Southwire's SIMpull Truck™ Earns NECA Showstopper Award 14-12-2011
DTS monitors HVDC Submarine Cable which links Iberian Peninsula with the Balearic Islands 24-11-2011
The Cable Directory to be Media Partner with Middle East Electricity Exhibition 2012 18-11-2011
Cable Corporation of India Ltd. implements the complete InnoVites software solution for cable manufacturing 31-10-2011
Datwyler supplies fibre optic cabling solutions with maximum transmission rates and packing densities 21-09-2011
Quality comes first at Hirschmann™ 25-07-2011
Cross Bonding Earthing Fault Detected by Distributed Temperature Sensing Surveillance in China 14-07-2011
New cable to offer Middle East to Europe alternative 21-06-2011

Advertisers